
Current Projects
Major projects currently under construction
SOUTH AUSTRALIA STATE AQUATIC CENTRE
- All pools in Myrtha Technology
- 52mx25mx3m deep Competition Pool with moveable boom, windows & pace lights
- 55mx25mx3-5m deep Dive/Water Polo Pool with moveable boom, aircushions & windows
- 2 Thermal Hydro Spas
- 1 Polar Chilled Hydro Spa
- 25m Program Pool - 0.9-1.4m deep with 12 person spa
- 15mx12mx1m deep Learn to Swim Pool
- 29mx15mx0-0.9m deep Leisure Pool with Inter-active water playground
- 12mx6mx0-0.3m deep Toddler Pool
- 12mx5mx 1.2-1.6m deep Slide Pool
- Splash Deck with Inter-active Features
- All pools filtered using state of the art UFF Defender Filters
- Pool Hydraulics in ABS
- Chemical Treatment Chlorine Gas and UV
- 72mx15m Space Hole Slide
- 102mx15m high Aquatube Slide
KWINANA HYDROTHERPY
-Myrtha modular renovation with wet deck
- All new pool hydraulics
- Upgrade filtration system
THOMASTOWN RECREATION & AQUATIC CENTRE
- Redevelopment, refurbishment and conversion of existing plantrooms to serve the new 25m pool, warm water / hydrotherpy / spa pools and leisure pool
AQUA RESORT (DUNSBOROUGH)
- 25m x 5m lap pool with vanishing edge
- Plastered internal finish with attached fully tiled spa
- (17) 5m x 2.5m Plunge Pools
- All filtration and hydraulics
MANDURAH TERRACE DEVELOPMENT
- 14m lap pool
- Fully tiled
- Pool hydraulics
- Water treatment plant using cartridge filters
THE ISLANDS - SOUTH BEACH
- 20m x 3.5m gym pool
- Fully tiled
- Pool hydraulics
- Sheer Flex Isolation Pads
- Water Treatment using cartridge filters
- Gas heating
- (2) 19m x 2.4m courtyard pools
- Fully tiled
- Pool hydraulics
- Water Treatment using cartridge filters
- Gas heating
- (3) 4.5m x 1.5m beach house pools
- Fully tiled
- Pool hydraulics
- Water treatment using cartridge filters
CLAREMONT VILLAGE
- Fully tiled lap pool
- Pool hydraulics
- Water treatment plant using cartridge filters












