Completed Projects

Major projects in order of completion

SUNSHINE AQUATIC CENTRE (VIC)
- Pool Hydraulics
- 25m pool water treatment plant using sand filters
- Interactive play park water treatment using UFF and UV units
- Cal Hypo water chemistry
- Interactive play park water features, including associated hydraulics

BIDYADANGA COMMUNTIY SWIMMING POOL
- 25m 'L' shaped swimming pool with beach entry using Myrhta technology
- Various water features
- Pool hydraulics
- Water treatment plant using sand filters
- Chlorine gas and soda ash
- All associated pool furniture
- All associated building works, including plantroom, managers office, kiosk, store rooms and amenities block

      

PORT FAIRY (VIC)
- 25 x 15m lap pool using Myrtha Technology
- Ramp entry
- Hot water zone

   

STATE SWIM, SECRET HARBOUR
- 25m lap pool, fully tiled
- Pool Hydraulics
- Water treatment plant using sand filters
- Sodium Hypochlorite, CO2 and UV Unit
- All Associated pool furniture\

   

SMITHS BEACH RESORT
- Infinity edge lap pool
- Childrens wading pool
- Pond water feature
- Internal plaster finish including water line tile
- Pool Hydraulics
- Water treatment plant using cartridge filters

   

LITTLE AUSSIE'S CHILDCARE CENTRE SPRAY PARK, DAWESVILLE
- Supply & Install interactive water features
- Water treatment plant using DE filters

   

THE SHED, BUNBURY
- Design & documentation of apartment pool/spa


STATE SWIM, ELLENBROOK
- 25m lap pool, fully tiled
- Pool Hydraulics
- Water treatment plant using sand filters
- Sodium Hypochlorite, CO2 and UV unit
- All associated pool furniture

   

CHALLENGE STADIUM
- Major renovation of 50m, 10 pool with Myrtha Renovaction
- Extend pool to accommodate movable beam, supply and install movable beam
- Renovate 50m, 8 lane pool with Myrtha Renovaction including retiling beams
- Refurbish 50m 10 lane & 50m 8 lane plant room

   

THE SWIM SCHOOL, BEAUMARIS
-  20m Lap pool
- Internal plaster finish including water line tile
- Pool Hydraulics
- Water treatment plant using cartridge filters

   

WARMUN COMMUNITY SWIMMING POOL
- 25m 'L' shaped swimming pool with beach entry using Myrhta technology
- Various water features
- Pool hydraulics
- Water treatment plant using sand filters
- Chlorine gas and soda ash
- All associated pool furniture
- All associated building works, including plantroom, managers office, kiosk, store rooms and amenities block

   

BALGA AQUATIC CENTRE
- 25m Lap Pool
- Leisure pool including river ride, toddlers pools and various water features
- Program pool
- All pools fully tiled
- Pool hydraulics
- Water treatment plant using sand filters
- Chlorine gas, soda ash and UV units
- All associated pool furniture

   

STEVES HOTEL
- Infinity Edge lap pool
- Internal plaster finish including water line tile
- Pool Hydraulics
- Water treatment plant using cartridge filters



ALBANY AQUATIC CENTRE
- 25m / Leisure pool including river ride and various water features
- Spa, Toddlers and Slide landing pool
- All pools fully tiled
- Pool hydraulics 
- Water treatment plant using sand filters
- Chlorine gas, soda ash and UV units
- All associated pool furniture

MILLSTREAM APARMENTS, SOUTH PERTH
- Internal plaster finish including water line tile to lap pool, spa pool and penthouse pools
- Pool Hydraulics
- Water treatment plant using cartridge filters

THE PENINSULA BURSWOOD TOWER 2
- Pool Hydraulics to lap pool
- Water treatment plant using sand filters

LIFESTYLE VILLAGE BRIDGEWATER, MANDURAH
- 13.5m x 7.5m pool plus spam concrete shell, plaster interior
- All filtration and hydraulics

NEXT GENERATION HEALTH CLUB, KINGS PARK
- 20m Indoor pool - concrete shell fully tiled
- Fully tiled concrete spa
- 20m outdoor roof-top pool - concrete shell fully tiled
- All filtration & hydraulics

CANNING AQUATIC CENTRE
- 50m renovation
- Vinyl lining 

MELBOURNE SPORTS AND AQUATIC CENTRE
- 50m competition lap pool for the 2006 Commenwealth Games, using Myrtha Technology
- Movable beam
- Hydrotherapy pool using Myrtha Technology

PACIFIC BLUE RESIDENTIAL RESORT
- 500m long x 8m wide concrete resort style river pool with pebbled beaches, spa nooks

SAFFRON APARTMENTS
- Lap pool 
- Internal Beadcrete finish including water line tiles
- Pool hydraulics
- Water treatment plant using cartridge filters

   


MSAC Movable Floor (VIC) (Largest in the southern hemisphere)
- Assist Myrtha and Variopool in the installation of the movable floor to the outdoor 50m pool and movable beam

BAYSWATER WAVES 50m POOL
- Remove existing centre channel
- New conrete encased PVC centre pipe & returns
- Re-furbish expansion joints
- Luxapool paint to pool floor

NATIONAL LIFESTYLE VILLAGE, HILLVIEW
- Freeform pool and spa pool
- Internal plaster finish including water line tile
- Pool Hydraulics
- Water treatment plant using cartridge filters

185 -187 HIGH STREET, FREMANTLE
- Internal plaster finish including water line tile
- Pool Hydraulics
- Water treatment plant using cartridge filters

EDEN APARMENTS, SOUTH PERTH
- Internal plaster finish including water line tile to lap pool, spa pool and penthouse pools
- Pool Hydraulics
- Water treament plant using cartridge filters

MILLSTREAM APARTMENTS, SOUTH PERTH (pictured below)
- Internal plaster finish including water line tile to lap pool, spa pool and penthouse pools
- Pool Hydraulics
- Water treament plant using cartridge filters

 

THE PENINSULA BURSWOOD TOWER 2
- Pool Hydraulics to lap pool
- Water treatment plant using sand filters

THE RICHARDSON, WEST PERTH (pictured left)
- Fully tiled heated lap pool
- Pool hydraulics
- Water treatment plant using cartridge filters
- Waterproof membrane to pool shell

 

NEXT GENERATION HEALTH CLUB, KINGS PARK (pictured below)
- 20m Indoor pool - concrete spa fully tiled
- Fully tiled concrete spa
- 20m outdoor roof-top pool - concrete shell fully tiled
- All filtration & hydraulics

 

CANNING AQUATIC CENTRE
- 50m renovation
- Vinyl lining

LIFESTYLE VILLAGE BRIDGEWATER, MANDURAH
- 13.5m x 7.5m pool spam concrete shell, plaster interior
- All filtration and hydraulics

NOVOTEL NIGALOO RESORT (pictured below)
- 28m x 22m freeform pool, concrete shell with plaster interior
- All filtration and hydraulics

   

MANJIMUP AQUATIC CENTRE (pictured left)
- 25m x 8 lane Learn to Swim pool/ Leisure Pool, including various water features, full tiled
- Pool hydraulics and  Water treatment plant using sand filters
- Chlorine gas, soda ash and UV unit
- All associated pool furniture

MANINGRIDA COMMUNITY SWIMMING POOL, NORTHERN TERRITORY 
- 25m 'L' shape swimming pool with beach entry and water features, using Myrtha Technology
- Pool Hydraulics
- Sand filtration & water chemistry

COLLEGE ROW, BUNBURY (pictured left)
- Hydrotherapy Pool, concrete shell fully tiled
- Supply & install all hydraulics & filtration

 

 

SEADRAGONZ
- 17m x 6m Learn to Swim Pool with concrete shell and commercial grade cinyl lined interior
- All pool hydraulics, water treatment & heating

AUSTRALIAN INSTITUTE OF SPORT
- State of the Art 50m x 25m, 3m depth Training & Competition pool with concrete shell, fully tiled, wet edge, including windows camera track etc.
- Hydrotherapy pool
- Plunge pool
- Fully tiled Spa

HALLS CREEK
- 25m x 20m Lap Pool with concrete shell, fully tiled
- Leisure & 'Learn to Swim' Pool with concrete shell, fully tiled
- All Hydraulics, Filtration and Water Treatment

CRAGIE LEISURE CENTRE
- 25m Lap pool
- Leisure Pool with 25m pool attached with level wet deck, concrete shell, fully tiled
- Fully tiled spa
- Supply & install all pool hydraulics
- Supply & install new water treatment plant c/w sand filter, UV units and water chemistry

HOLIDAY INN BURSWOOD
- Supply & install internal pool finishes
- Supply & install all pool filtration equiptment

GRANVILLE AQUATIC CENTRE
- Supply & install pool filtration & hydraulic equiptment
                              - 50m Pool
                              - 25m / Learn to Swim Pool & Leisure Pool

UNIVERSITY OF WESTERN AUSTRALIA
- 33m x 25m Water Polo Pool with level wet deck using Myrtha Technology
- Supply & install all pool hydraulics
- Suppl & install new water treatment plant c/w sand filtration and water chemistry

STATE SWIM, Craigieburn VIC
- 20m x 10m Learn to Swim Pool with level wet deck, concrete shell, fully tiled
- Supply & install all pool hydraulics
- Supply & install new water treatment plant c/w sand filtration and water chemistry

AQUINAS COLLEGE, Perth WA
- Supply & install a new gas fired boiler heating system to serve existing 50m x 18m swimming pool

ALBANY LIFESTYLE VILLAGE, WA
- Indoor Hydrotherapy pool
- Supply & install all plant & equipment

FREYCINET RESORT, Margaret River WA
- Oudoor 11m x 9m Resort Pool
- Supply & install pool filtration equipment

YARRA JUNCTION AQUATIC CENTRE, VIC
- 25m x 15m Lap pool using Myrtha Technology
- 10m x 8m Learn to Swim pool using Myrtha Technology
- 11.5m x 8m Leisure pool with beach using Myrtha Technology

THREE SPRINGS, WA
- Hyrdraulics & Balance tank upgrade to 50m & Toddlers pools

THOMASTOWN AQUATIC & RECREATION CENTRE, VIC
Plantroom refurbishment comprising of:
- Decommissioning existing plantroom and filter cells
- Construction of a new 50m outdoor plantroom
- Construction of a new bulk chlorine room and delivery station
- Supply and installation of sand filters to outdoor pool, program pool and 25m Learn to Swim pool
- Supply and installation of UV units to program pool and 25m Learn to Swim pool
- Supply and installation of a backwas water recovery system
- Rebuild balance tanks

PERTH CONVENTION CENTRE, WA
(pictured left)
- Hotel pool & spa
- Supply & install all plant & equipment




CHALLENGE STADIUM, WA
- Plantroom refurbishment of Indoor 50m pool and Dive pool

TRINITY COLLEGE, Perth WA
(pictured below)
- 50m Outdoor Lap pool with level wet deck to 2 sides of pool using Myrtha Technology

DUBBO AQUATIC CENTRE, NSW
- New Children's Leisure Pool with concrete shell & fully tiled interior with wet decking to all sides
- Supply & install water features
- Supply & install filtration equipment
- Supply & install heating

ROYAL PERTH HOSPITAL, Perth WA
- 25m Pool Renovation including commercial grade reinforced vinyl liner bonded to pool shell
- Renew concrete concourse

YALLINGUP COUNTRY RETREAT, South West WA
(pictured left)
- 12.5m Concrete pool with vanishing edge & rainbow quartz interior
- Filtration & water chemistry
- Gas heating




BELCONNEN INDOOR POOL & LEISURE CENTRE, ACT
(pictured below)
- 50m x 25m Lap pool with level wet deck, concrete shell & vinyl interior
- 25m Lap pool attached to 20m x 15m fully tiled Leisure pool
- Fully tiled Hydrotherapy pool
- Fully tiled spa

PORT KEATS ABORIGINAL COMMUNITY, Wadeye NT
(pictured below)
- 25m 'L' shape swimming pool with beach entry and water features, using Myrtha Technology
- Pool hydraulics
- Sand filtration & water chemistry

TAMMIN CATCHMENT MODEL, South WA
- Concrete ponds & water features with waterfall and spillway
- All hydraulics
- Filtration and water chemistry

SWAN PARK LEISURE CENTRE, Perth WA
25m Training Pool & Leisure Pool Renovation including:
- Rebuild Beach entrance
- Fully tile interior
- Build new water feature
- Replace all Stainless Steel furniture

STATE SWIM, Osborne Park WA
- 20m x 10m Indoor pool fully tiled
- Pool hydraulics
- Sand filtration plant, chemical dosing
- Electric Heat pumps supply & install

NEXT GENERATION HEALTH CLUB, Bibra Lake WA
- 25m Indoor pool with level wet deck, concrete shell & vinyl interior
- 25m Outdoor pool with skimmer boxes, concrete shell & vinyl interior
- 7m x 4m Toddlers pool with level wet deck, concrete shell & vinyl interior
- Fully tiled spa with level wet deck
- All filtration, chemical treatment & pool hydraulics

SOUTH LAKES LEISURE CENTRE, Perth WA
(pictured below)
- 25m Lap Pool & Leisure Pool Renovation including
widening 6 lanes to 8 lanes
fully tiled interior
- New Hydraulics
- Fully tiled Spa pool
- Spa filtration plant incorporating UFF filter & UV unit

No.12 BELLEVUE TERRACE APARTMENTS, West Perth WA
- Plant room filtration, pipework and furniture to Pool & Spa

STATE SWIM, East Fremantle WA
- Supply & install Heat pumps to Indoor 25m pool

WARNBRO AQUATIC CENTRE, South West WA
(pictured below)
- 50m x 22m Lap pool with level wet deck, concrete shell & vinyl interior
- 25m x 20m Lap pool with level wet deck, concrete shell & vinyl interior
- 37m Leisure pool and attached 25m Lap pool, Slide pool, Toddler pool & River Ride with level wet decking, concrete shell and fully tiled interior
- 10m x 7m Hydrotherapy pool with level wet deck, sprayed concrete shell and fully tiled interior
- 5m diameter Spa with level wet deck, sprayed concrete shell & fully tiled interior

SHIRE OF BRUCE ROCK, South East WA
(Pictured below)
- Renovation of 33m x 10.5m Outdoor pool including:
widening pool to 13.2m,
convert to level wet deck,
new pipework
- New Leisure pool and Slide pool with vinyl interior
- Installation of new Filtration plant & equipment

GREENACRE SWIMMING CENTRE, NSW
- 50m Outdoor Lap pool renovation
- 25m Learn-to-Swim pool renovation
Both pools converted to level wet deck, replace pipework, vinyl interior bonded to pool shell, new concourse & fencing

TELFER GOLD MINE, North WA
- 25m Outdoor pool renovation with vinyl interior bonded to pool shell, upgrade of plant & equipment

CHRIST CHURCH GRAMMAR SCHOOL, Perth WA
(pictured left)
- 50m x 15m Outdoor Lap pool renovation with new level wet deck, new pipework, vinyl interior bonded to pool shell, new concourse and filtration




NARROGIN RECREATION CENTRE, South East WA
(pictured below)
- 25m Indoor pool & Leisure pool with sprayed concrete shell, level wet deck, vinyl liner bonded to 25m pool and fully tiled Leisure pool

KWINANA AQUATIC CENTRE, South West WA
- Vinyl lining bonded to pool shell of new 25m pool

ST BRIGID'S COLLEGE, Perth WA
(pictured below)
- 25m x 20m Lap & Leisure Indoor pool with level wet deck, sprayed concrete shell & vinyl interior
- 12m x 6m Learn to swim pool with level wet deck, sprayed concrete shell & vinyl interior

SHIRE OF DONNYDROOK/BALINGUP, South West WA
- Supply and install heat pumps to Indoor 25m pool

KARALUNDI REMOTE ABORIGINAL COMMUNITY, Central WA
(pictured below)
- 25m x 12m Outdoor pools with level wet deck to all 4 sides using Myrtha Technology, c/w plantroom & landscaping

MERCEDES COLLEGE, Perth WA
- Fully tiled renovation to 25m pool and plantroom upgrade

ALL SAINTS COLLEGE, Perth WA
- Vinyl lining bonded to pool shell of new 25m & Toddler pools

PENRHOS COLLEGE, Perth WA
- 50m Outdoor lap pool renovation with new level deck, pipework, vinyl liner bonded to pool shell and new balance tank
- Installation of Heat pumps

RIVERTON AQUATIC CENTRE, Perth WA
(pictured below)
- 50m Indoor Olympic Lap pool with level wet deck to 2 sides of pool using Myrtha Technology
- Hot Exercise Pool using Myrtha Technology

SOUTH WEST SPORTS CENTRE, Bunbury WA
(pictured below)
- 50m x 25m Indoor Lap pool with level wet deck, sprayed concrete shell & vinyl interior
- 25m x 10m Indoor Lap pool with level wet deck, sprayed concrete shell & vinyl interior
- 30m x 20m Leisure pool with level deck, sprayed concrete shell & tiled interior
- Fully tiled 6m Spa

NEWMAN AQUATIC CENTRE, Central WA
- 50m Outdoor lap pool renovation with new level deck, pipework and vinyl interior bonded to the pool shell

GOSNELLS LEISURE WORLD, Perth WA
(pictured below)
- 25m & Leisure pool renovation using vinyl lining bonded to pool shell

SYDNEY INTERNATIONAL AQUATIC CENTRE, Homebush NSW
- Leisure pool renovation using vinyl liner bonded to the pool floor

SHENTON PARK REHABILITATION HOSPITAL,
Perth WA (pictured left)
- 19m x 7m Indoor Hydrotherapy pool refurbishment using Myrtha Renovaction





LESCHENAULT AQUATIC CENTRE, South West WA
- 25m Activity Pool and Leisure pool with sprayed concrete shell and vinyl interior
- Fully tiled spa

OLD SWAN BREWERY APARTMENT COMPLEX,
Perth WA (pictured left)
- Indoor 9.5m x 3.5m fully tiled concrete pool using glass mosaic tiles





TERRY TYZAK AQUATIC CENTRE, Inglewood WA
(pictured below)
- 25m x 19m Indoor lap pool with level wet deck to 2 sides of pool using Myrtha Technology
- Renovations to existing 50m Lap Pool, Dive and Learners pools

HOMESWEST PROJECT - REMOTE ABORIGINAL, Central WA
(3) 25m x 12m Outdoor pools with level wet deck to all 4 sides using Myrtha Technology

MANNING AQUATIC CENTRE, Taree NSW
- 25m Lap & Leisure pool with vinyl lining bonded to pool shell

DOCKERS TRAINING POOL, Fremantle WA
(pictured below)
- 25m x 6.6m Indoor lap pool with level wet deck to all 4 sides using Myrtha Technology

ARENA JOONDALUP AQUATIC CENTRE, Perth WA
(pictured below)
- 50m x 22m Indoor lap pool with level wet deck to all 4 sides using Myrtha Technology

PARAGON HEALTH CLUB, Perth WA
- 12m x 4m Training pool suspended from 5th floor

SHIRE OF KUNUNURRA, North WA
- 25m x 25m Outdoor Renovation using Alkor2000

SHIRE OF DONNYBROOK/BALINGUP, South West WA
(pictured below)
- 25m x 12m Indoor lap pool renovation, converting from skimmer box to a wet deck overflow system

SHIRE OF DALWALLINU, South East WA
- Outdoor 25m x 12m lap pool with wet deck on all 4 sides using Myrtha Technology
- Freeform toddlers pool

PERTH LADIES COLLEGE, Perth WA
- 50m x 16m Outdoor lap pool renovation

BUSSELTON AQUATIC CENTRE, South West WA
(pictured below)
- Indoor 25m lap pool and freeform adventure pool with beach and wet deck
- Outdoor 25m x 19m lap pool
- Fully tiled spa

AMBLIN CARAVAN PARK, South West WA
- 18m Leisure pool renovation

SHIRE OF MARGARET RIVER, South West WA
(pictured left)
- Indoor vinyl lined, 25m lap pool with freeform adventure pool with beach, and wet deck





METHODIST LADIES COLLEGE, Perth WA
- 25m x 16m Outdoor lap pool renovation

SHIRE OF WAROONA, South West WA
(pictured left)
- Indoor 25m lap pool and freeform toddlers pool with semi wet deck





MANDURAH AQUATIC CENTRE, South West WA
- Spa rebuild and refit

COCKATOO ISLAND RESORT, Central WA
- Freeform pool renovation